LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE TREATMENT PLANTS
HYPERION TREATMENT PLANT
  About our plant
  Tours: Virtual and On-site
Construction Projects:
 
  Discharge System Replacement Project
  Primary Battery B Modifications
  Primary Battery Odor Control Upgrades
  Awards
  Technical Corner
  Odor Control Projects
TERMINAL ISLAND WATER RECLAMATION PLANT
DONALD C. TILLMAN WATER RECLAMATION PLANT
LOS ANGELES - GLENDALE WATER RECLAMATION PLANT

Hyperion Treatment Plant

Construction Projects

The Bureau of Engineering is currently managing about 90 construction projects at the Hyperion Treatment Plant. These improvements are being built so we can continue to provide reliable service while protecting the health of the public and the environment.

During construction, the City takes care to keep noise, dust, traffic, and any other potential construction nuisances to a minimum.  We also often meet with and distribute updates to project neighbors before and during construction to get input and give progress reports.

 Here are some current projects at the Hyperion Treatment Plant:



Primary Battery C Modifications
Primary Battery C (PBB) was designed in 1948 and constructed soon after. PBB is now being refurbished and modernized under the PBB Modifications Project.  PROJECT PAGE

 

Look up construction projects

You can learn about many of Hyperion's current and planned construction projects by looking them up at the Bureau of Engineering's Uniform Project Reporting System (UPRS) web pages.

HYPERION CONSTRUCTION PROJECTS
(results appear in a new window)

 

 

 

 

CONTACT AND INFORMATION
 To report sewer ODORS, click HERE or call (800) 773-2489
 To report sewer SPILLS, call (800) 773-2489
For other questions, call (213) 978-0333
or email bpw.pao@lacity.org
City of Los AngelesDepartment of Public Works
COPYRIGHT
AND DISCLAIMER